Architecture / UML

NTN resilience

When the ground network fails, a non-terrestrial path is only useful if you know what still works and what gets worse.

Accepted source 05aaa9aec168 · ACCEPTED_MAIN · simulation

Scenario outputs are simulations. They are not an on-orbit measurement or a satellite service-level agreement. measured_topology is not recorded as true.

Current is shown first. Future and legacy stay labeled. A rendered SVG is used when accepted main already committed one. Otherwise the Mermaid or Markdown source is shown and is not executed in the browser.

Current

Use case — current

current mermaid

What this diagram shows

UC3[Compare fallback / static / adaptive]

What this diagram does NOT prove

This diagram does not prove an operational satellite network.

Open full sizeDownload
flowchart LR
  subgraph actors
    R[Researcher]
    I[Independent reproducer]
  end
  subgraph ntn [ntn-resilience-sim]
    UC1[Load documented assumptions]
    UC2[Run terrestrial baseline]
    UC3[Compare fallback / static / adaptive]
    UC4[Sweep delay capacity visibility]
    UC5[Repeat seeds and recovery metrics]
    UC6[Emit synthetic result JSON]
  end
  R --> UC1
  R --> UC2
  R --> UC3
  R --> UC4
  R --> UC5
  I --> UC1
  I --> UC6

Source path docs/uml/current/use_case.md @ 05aaa9aec168

Sequence — terrestrial / NTN failover (current)

current mermaid

What this diagram shows

participant T as Terrestrial link (assumption)

What this diagram does NOT prove

This diagram does not prove an operational satellite network.

Open full sizeDownload
sequenceDiagram
  participant T as Terrestrial link (assumption)
  participant P as Policy (baseline/static/fallback/adaptive)
  participant N as NTN link (TR 38.821 ranges)
  participant S as Min-service threshold
  T->>P: up / down this step
  N->>P: visible / not visible
  P->>P: select path
  alt path meets min capacity and max latency
    P->>S: service_ok
  else offline or degraded
    P->>S: service_miss until recovery_steps
  end

Source path docs/uml/current/sequence_failover.md @ 05aaa9aec168

Future

Future — orbit-accurate visibility

future mermaid

What this diagram shows

TLE[Public TLE / ephemeris] --> VIS[Pass windows]

What this diagram does NOT prove

This diagram does not prove an operational satellite network.

Open full sizeDownload
flowchart LR
  TLE[Public TLE / ephemeris] --> VIS[Pass windows]
  VIS --> SIM[Existing experiment engine]
  MEAS[Consented field NTN traces] --> SIM

Source path docs/uml/future/orbit_accurate.md @ 05aaa9aec168

Legacy

Legacy UML index — ntn-resilience-sim

legacy markdown

What this diagram shows

Legacy UML index — ntn-resilience-sim

What this diagram does NOT prove

This diagram does not prove an operational satellite network.

Open full sizeDownload
# Legacy UML index — ntn-resilience-sim

| Topic | File |
|-------|------|
| Placeholder README | [placeholder_readme.md](placeholder_readme.md) |

Source path docs/uml/legacy/index.md @ 05aaa9aec168

Architecture library